{"id":987484395,"date":"2022-12-01T05:36:50","date_gmt":"2022-12-01T05:36:50","guid":{"rendered":"https:\/\/www.alistairgroup.com\/?p=987484395"},"modified":"2022-12-01T05:36:50","modified_gmt":"2022-12-01T05:36:50","slug":"pioneer-facilities-installation-and-management","status":"publish","type":"post","link":"https:\/\/www.alistairgroup.com\/pioneer-facilities-installation-and-management\/","title":{"rendered":"PIONEER FACILITIES INSTALLATION AND MANAGEMENT"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Setting up base for the first time in a new country can be a challenging task with its own set of unique obstacles and compliance issues.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Our international client was in search of a regionally established partner to assist with the supply, installation, construction and management of their pioneer temporary facilities in Temane, Mozambique.<\/span><\/p>\n<p><b>Our customer&#8217;s business challenges:\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Our client required an all-inclusive turnkey solution where Alistair Group was the main point of contact.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The scope of work consisted of\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supply, delivery and installation of modular units\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Civil works, such as fencing, electrical works, etc<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Managing the campsite in terms of daily consumptions, generator, waste management and more.<\/span><\/li>\n<\/ul>\n<p><b>Our key actions to meet our customer&#8217;s expectations:\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Alistair Group has been established in Temane since 2013 and therefore has the required knowledge and assets to operate in this remote area.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Together with our experience and safety procedures, we are able to comply with the strict health and safety requirements set forth by the client.<\/span><\/p>\n<p><b>Tangible results:\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Alistair Group was able to execute the operation within the expected timeframe and budget, managing the campsite up until January 2023.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-987484397\" src=\"https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/TSK-Pioneer-3.jpeg\" alt=\"\" width=\"261\" height=\"348\" \/>\u00a0 \u00a0 <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-987484396\" src=\"https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/TSK-Pioneer-2.jpeg\" alt=\"\" width=\"261\" height=\"348\" \/><\/p>\n<p style=\"text-align: right;\"><em>Pauline Desmet | Material Handeling Lead | 01 Decemebr 2022<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Setting up base for the first time in a new country can be a challenging task with its own set of unique obstacles and compliance issues.\u00a0 Our international client was in search of a regionally established partner to assist with the supply, installation, construction and management of their pioneer temporary facilities in Temane, Mozambique. Our [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":987484398,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[27,10,25],"tags":[31,20,21,32],"class_list":["post-987484395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-clearance","category-news","category-transport","tag-document-management","tag-logistics","tag-technology","tag-visibility"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/posts\/987484395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/comments?post=987484395"}],"version-history":[{"count":4,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/posts\/987484395\/revisions"}],"predecessor-version":[{"id":987484403,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/posts\/987484395\/revisions\/987484403"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/media\/987484398"}],"wp:attachment":[{"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/media?parent=987484395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/categories?post=987484395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/tags?post=987484395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}