{"id":987484387,"date":"2022-12-01T05:37:04","date_gmt":"2022-12-01T05:37:04","guid":{"rendered":"https:\/\/www.alistairgroup.com\/?p=987484387"},"modified":"2022-12-01T05:37:04","modified_gmt":"2022-12-01T05:37:04","slug":"pipe-transport-case-study","status":"publish","type":"post","link":"https:\/\/www.alistairgroup.com\/pipe-transport-case-study\/","title":{"rendered":"PIPE TRANSPORT CASE STUDY"},"content":{"rendered":"<h2><\/h2>\n<h2><\/h2>\n<h2 style=\"text-align: center;\">A CONTINUOUS 120-HOUR OPERATION OF PIPE TRANSPORT<\/h2>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-987484388\" src=\"https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/ENI-operation-2.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/ENI-operation-2.jpeg 1024w, https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/ENI-operation-2-980x735.jpeg 980w, https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/ENI-operation-2-480x360.jpeg 480w\" sizes=\"auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/p>\n<p><span style=\"font-weight: 400;\">Transportation of cargo can sometimes be a challenging task; this is especially true when it comes to delivering cargo on time. Once a charter vessel has berthed there is a limited time to get the cargo to the offloading location at the port.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Our customer, one of the largest players in the Mozambique energy sector, was in search of a transport and logistics provider who would deliver exceptional support in performing this time and safety-sensitive task. They have a globally diverse, world-class portfolio of operations and projects and Alistair Group has all the experience and credentials they were looking for.\u00a0<\/span><\/p>\n<p><b>Our client&#8217;s business challenges:\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Our customer required the lifting, loading and transportation of pipes, of several diameters, from their base in Pemba to CFM Pemba port. The operations needed to be conducted continuously on a 24-hour basis to meet the vessel&#8217;s deadlines.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This operation comprised of multiple elements;\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Safely handling, lifting and loading the cargo on the trucks\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ensuring the goods are suitably packed to prevent damage during transport to the site\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ensuring continuous operation on a 24 hours basis for\u00a0 5 days straight to meet deadline requirements.<\/span><\/li>\n<\/ul>\n<p><b>Our key actions to meet our customer&#8217;s expectations:\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Alistair Group is an asset-based business and thus mobilised all the necessary resources to successfully execute this project. A total of 3 cranes, 4 escort vehicles, a telehandler with pipe clamps and 15 trucks were involved in successfully completing this operation. Our key strength whilst executing this project was our health and safety procedures, resulting in 0 incidents during the continuous 120-hour operation.<\/span><\/p>\n<p><b>Tangible results:\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Alistair Group was able to perform the operation within the expected timeframe and budget, with 0 incidents, resulting in a satisfied client.\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-987484390\" src=\"https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/ENI-operation-3.jpeg\" alt=\"\" width=\"1024\" height=\"576\" srcset=\"https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/ENI-operation-3.jpeg 1024w, https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/ENI-operation-3-980x551.jpeg 980w, https:\/\/www.alistairgroup.com\/wp-content\/uploads\/2022\/11\/ENI-operation-3-480x270.jpeg 480w\" sizes=\"auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/p>\n<p style=\"text-align: right;\"><em>Pauline Desmet | Material Handeling Lead | 01 Decemebr 2022<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A CONTINUOUS 120-HOUR OPERATION OF PIPE TRANSPORT &nbsp; Transportation of cargo can sometimes be a challenging task; this is especially true when it comes to delivering cargo on time. Once a charter vessel has berthed there is a limited time to get the cargo to the offloading location at the port.\u00a0 Our customer, one of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":987484389,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[27,10],"tags":[66,32],"class_list":["post-987484387","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-clearance","category-news","tag-template-1","tag-visibility"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/posts\/987484387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/comments?post=987484387"}],"version-history":[{"count":5,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/posts\/987484387\/revisions"}],"predecessor-version":[{"id":987484401,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/posts\/987484387\/revisions\/987484401"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/media\/987484389"}],"wp:attachment":[{"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/media?parent=987484387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/categories?post=987484387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.alistairgroup.com\/wp-json\/wp\/v2\/tags?post=987484387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}